On these pages, you can find out about current basic water and wastewater charges, as well as its consumption and treatment charges. You can also find information on these pages in the FAQs section regarding the price changes coming into effect on 1 June 2026.
You can find VAT-exclusive water prices, connection charges and more detailed terms and conditions in the comprehensive water price list.
Basic charges for water and wastewater
A fixed basic charge, determined by the size of the property’s water meter, covers the maintenance costs of the water connection. The basic charge also covers the maintenance of the water supply network, as well as water pumping stations and sewage treatment works.
The basic charge is levied on a monthly basis from the moment the property is connected to the utility’s network until it is disconnected from the network. The basic charge includes the main water meter charge. Water and wastewater each have their own basic charges of the same amount, as shown in the table below.
Prices include 25.5% VAT.
| Water meter size | Basic water charge (€/year) | Basic sewage charge (€/year) |
|---|---|---|
| 20 or under | 185.58 | 185.58 |
| 25 | 485.31 | 485.31 |
| 32 | 770.80 | 770.80 |
| 40 | 1,284.67 | 1,284.67 |
| 50 | 1,827.06 | 1,827.06 |
| 60 | 2,569.31 | 2,569.31 |
| 80 | 3,482.83 | 3,482.83 |
| 100 or more | 5,052.94 | 5,052.94 |
Water and Wastewater Usage and Treatment Charges
The consumption charge is based on the volume of water used at the customer’s premises and the volume of normal domestic wastewater to be discharged. A consumption charge is levied on both water and wastewater. The water utility supplies one water meter, which it owns, for each water connection. The water utility always carries out the installation of the water meter. A treatment charge is levied on sludge from septic tanks and closed tanks received and treated by the water utility. Pricing for sewage treatment plant sludge and other types of sludge is determined on a case-by-case basis.
Please refer to the table below for water and wastewater usage and treatment charges. Prices are quoted per cubic metre and include 25.5% VAT.
| Usage and processing fees | € / m³ |
|---|---|
| Water charge | 2.43 |
| Sewage charge | 3.59 |
| Treatment charge for septic tank sludge | 12.55 |
| Sewage sludge treatment charge | 25.10 |
Water tariffs and terms and conditions
Find out about water connection charges, contract terms and conditions, and more detailed information on how water charges are calculated in the comprehensive water price list.